Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 28, 2020     Wire braiding for shunts; Wire standoffs in hell-hole - (1.2 hours)       Category: Electrical
1. Created two 4-foot long wire braids of 3 x 22AWG wire to match the volt-ammeter manufacturer's factory braids, which are unfortunately too short.
2. Installed 3 Adel clamps on standoffs in the avionics hell-hole -- one for the smoke oil line, and two for a large bundle of ground wires that will be connected to the main grounding block nearby.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.